top of page
FAQ
-
What is the return on investment for the system?The economic benefit of TREELUMINO primarily comes from visibility and return, which means the value of showcasing your clean energy stewardship. Solar trees reduce your electricity bill and provide tax benefits, but they are primarily an investment in public communication.
-
How much energy do they generate and what do you do with that energy?The capacity of solar trees ranges from 2.5 to 3.5 kW. You can do a lot with this energy, but it is not intended as the primary source for commercial properties. Our solar technologies are usually connected to the nearest electrical connection of your property, and the energy offsets the building's needs. Often, they are set up to power electric vehicle charging stations. One tree can produce enough energy to run an electric vehicle for 30,000 km per year.
-
Do your solar trees qualify for tax credits?Our technologies are solar devices and therefore meet the standards for tax credits and grants that apply to solar systems. TREELUMINO products are 100% made in Slovakia.
-
What is the lead time for installation?Please allow eight weeks from the order date to the installation date of the technologies. It is important to plan for permits for in-ground concrete foundations.
-
How long does the installation take?After the foundations are built, the installation of our structures takes about one day. Completing the electrical connections may take another day.
-
Can we install them at home?TREELUMINO products are intended for commercial and public spaces, combining public art and clean energy technology. If that suits your home as well, it is okay with us.
bottom of page